PLAN:

Created a logical plan. You need to Complete the whole project by 20th November

 

Copy this table into Microsoft word or Excel

Deliverable Step Resources Estimated Duration / Time (lessons) Expected Date Completed?
           
           
           
           

 

 

1. What are the Deliverables? (Things you have to Do / Hand In)

Write a todo list showing down what you need to do / hand in

This should include:

  • completing final logo in Illustrator
  • Engrave your logo onto your choice of material
  • completing process journal
  • evaluating the create stage
  • put all your work into your books
  • complete your evaluation

There may be other tasks that you can think of!

Add them to your table. See example below:

Deliverable Step Resources Estimated Duration / Time (lessons) Expected Date Completed?
Create - Illustrator work          
Create -Laser engraving          
Create - process journal          
Evaluate stage: Evaluate create stage          
Complete design portfolio          
Final Evaluation          

 

2. What are the Steps to create these Deliverables?

List out the steps to create each deliverable. It's a question of putting the steps in a logical order. Add them to your table

Your table could look something like this:

Deliverable
Step
Resources Estimated Duration / Time (lessons) Expected Date Completed?
           
Create - Illustrator work Learn how to make a flower in Illustrator        
  Draw the ground in Illustrator        
  Add the text        
  create final layout        
Create -Laser engraving Prepare logo for the laser        
 
  • open the illustrator laser template here
       
 
  • Paste my design into the template
       
 
  • Make sure all lines we want to engrave are coloured "Engrave Black"
       
 
  • Make sure all lines we want to cut are coloured "Engrave Red" and a thickness of 0.001pt
       
  Prepare my materials for the laser        
  Engrave my product        
Create - process journal Write the process journal for each day        
  Evaluate create stage        
  Stick rubric into my portfolio        
Evaluate stage: Evaluate create stage write evaluation        
Complete design portfolio print out work        
  cut out work        
  stick work into portfolio        
  stick create part of rubric into my book        
Final Evaluation Test final design        
  write final evaluation report        
  stick final rubric into my book        

3. Now add the resources needed at each step

You are one resource! - If you were planning a large project you would enter the number of people working on each stage as a resource. In our case the resources would mainly be materials and equipment. Add resources to your table

4. Estimate the Duration (Time) / date for each Step

Be careful - check your planner for holidays and half days. Add the time and dates to your table

5. What are the deadlines?

How long do you have?

6. What are the risks / possible problems?-

Think about :

  1. How will you review progress?
  2. what could go wrong?

7. What modifications if any do you think you will need to make to your design?

  • Things are bound to change. The schedule is not just something you file away and forget. As the weeks pass, constantly review the schedule. Enter the actual time you spend. Adjust the time estimates if you find they have changed.You may need to go back to your design and make some changes. Perhaps

9. Check the rubric

 

plan

 

0

You have not reach a standard described by any of the descriptors given below.

1-2

You have produced a plan that contains some details of the steps to make your product and/or the resources required.

3-4

The student produces a plan that contains a number of logical steps that include resources and time. The student evaluates the plan.

5-6

You have produced a plan that contains a number of detailed, logical steps that describe the use of resources and time. You have analysed the plan and explained any modifications that you have needed to make to your plan/design.

Investigate Design Plan Create Evaluate